Offshore Wind Power
Sea Hoisting Assessment Analysis
This project establishes the required hoisting operation assessment capability in compliance with the marine warranty survey, covers the process of air hoisting and water inflow, considers the hydrodynamic effects of waves and wave slamming in the dynamic load analysis as the basis to assess the structure and sling structure simultaneously and completes the establishment of analysis items and analysis processes required for loading and hoisting operation safety assessment and perform analysis verification with the load of more than 3.6 MW and foundation of water depth up to 45m as the example.