Quality Control
The engineers currently participating in the technical service of the Center are qualified by the national certified public engineering quality management engineers, among them, there are Certified Welding Inspectors of American Welding Society (AWS CWI) cooperating with the implementation of welding inspection and welder certification, and the personnel qualified for NACE International Certified Painting Inspectors cooperating with the implementation of the PSPC painting inspection work, and requesting the construction unit to maintain construction quality correctly in the construction and delivery acceptance phases with their professional qualifications and status.
Equipment Inspection
When the performance operation verification testing inspection must be performed after completing the important equipment in the manufacturing factory, such as the Main Engine, Generators, Boilers, Propellers, Windlass, Steering Gears, Main Switch Board, etc., the Center can dispatch the more appropriate personnel according to their professional expertise and experience to attend FAT, represent of the ship’s owner or the proprietor in participating, so that the equipment can be operated smoothly without concern after installation.
Supervision
The Center can provide the ship’s owner and proprietor with factory (plant) supervision and inspection services according to the individual case requirement of the following various construction projects.
Construction of various size ships, vessels and boats.
Ship modification, maintenance and other projects.
The ship and equipments annual repair or overhaul project.
The power system construction of the onshore power plant.
Repair or maintenance of power plant and system.
Construction work of steel structures and aluminum structures onshore.