Ship Equipment
Wind Turbine Installation Vessel
This is an integrated application of Wind Turbine Installation Vessel combined with the engineering technology of ICP offshore wind turbine installation and repaired platform vessel. In order to integrate the related technology to achieve the international standards, the support leg and the platform project of this installation vessel is developed combining with the International Industrial Cooperation Program (ICP), and cooperating with European companies with practical experience in design and construction, to perform integrated design, analysis and assessment, so as to develop the ship types of wind turbine installation vessel with the best performance operating in West Coast and East Asia. Thus, it will assist the industry in making good investment decisions as quickly as possible.